The scope of CCC certification for motor vehicles shall be in accordance with the requirements of the Implementing Rules for vehicles of category M, N and O (including complete vehicles and non-integrated vehicles). The certification according to the general safety standards eg GB 7258 "technical requirements for the safe operation of motor vehicles", For specific product inspection articles, please refer to the implementation rules of CNCA-C11-01: 2014 Automotive Annex 1 Type Test Projects and Standards.

1, How long does it take from the application to the receipt of the certificate?

90 days are set by law for cetification. According to experience, these sometimes take longer.

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: up to 10 man day per model series, depending of subparts certified

FI audit: up to 6 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is the audit conducted?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

  1. Application form
  2. License in copy-Questionnaire uključujući kratke informacije o tvrtki, procesu proizvodnje, popis osnovnih proizvodnih pogona, popis osnovnih testnih instrumenata, dokaz o registriranom zaštitnom znaku, itd.
  3. Car structure and technical parameters
  4. COP control plan
  5. Declaration: how is type, series defined
  6. Declaration: how is VIN defined
  7. Explanation: we distinguish the different types by external marking
  8. Declaration: Operating instructions in Chinese
  9. COC certificate
  10. Review
  11. Quality Manual
  12. Quality system certificates in copy
  13. Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

CCC vijesti

Najavljeni su rezultati nadzora i kontrole proizvoda CCC u Kini Najavljeni su rezultati nadzora i kontrole proizvoda CCC u Kini 2019-02-15 - U skladu s relevantnim odredbama "Pravilnika ...
izdani akreditirani ispitni laboratoriji za CCC proizvode izdani akreditirani ispitni laboratoriji za CCC proizvode 2019-02-06 - CNCA ("Certifikacija i akreditacija uprave PRC") ...
opseg poslovanja testnih laboratorija u Kini ažuriran opseg poslovanja testnih laboratorija u Kini ažuriran 2019-01-04 - prema nedavnoj najavi, sljedeći posao ...
46 GB Standardi koji se revidiraju 46 GB Standardi koji se revidiraju 2018-12-30 - Prema nedavnom tisku objavljenom iz Standardizacije ...
ažuriran je opseg poslovanja akreditiranih ispitnih laboratorija za proizvode CCC ažuriran je opseg poslovanja akreditiranih ispitnih laboratorija za proizvode CCC 2018-12-26 - prema nedavnoj najavi CNCA, opseg poslovanja ...
Najavljen je kineski raspored praznika 2019 Najavljen je kineski raspored praznika 2019 2018-12-23 - prema nedavnoj najavi Glavnog ureda ...
Ažurirao se kineski CCC katalog Ažurirao se kineski CCC katalog 2018-12-17 - Prema nedavnoj zajedničkoj najavi SAMR-a ("Država ...
nova Kina certifikacijska tijela za vatrogasne proizvode nova Kina certifikacijska tijela za vatrogasne proizvode 2018-12-16 - prema trenutnoj najavi CNCA ("Certification ...
Otpušten je 27 novi GB standard Otpušten je 27 novi GB standard 2018-11-26 - Prema nedavnom tisku objavljenom iz Standardizacije ...
Otpušten je 7 novi GB standard Otpušten je 7 novi GB standard 2018-11-03 - Prema nedavnom tisku objavljenom od Državne uprave ...

podrška

Unterstützung

Radite u svom ritmu. Svoje projekte možete samostalno upravljati preko našeg portala, kao i pitati o osobnoj podršci. Zato smo se obvezali na priliku da dizajnirate svoje vlastite procese

Online uprava

Online uprava

Nudimo Vam mogućnost da provedete svoj proces certifikacije, ali ne morate napustiti know-how ili podršku iskusnih zaposlenika. On-line sustav je dizajniran za razne certifikate i nudi vam popise najčešćih pitanja, kao i gotove obrasce i tablice, kao i modul za razjašnjenje otvorenih pitanja s jednim od naših zaposlenika.

Promijeni certifikaciju

Promijeni certifikaciju

U našem brzom vremenu promjene u poslovnom životu su stalna pratnja. Može se razbiti vrlo brzo. Postoje unutarnji i vanjski razlozi za to. CS daje pregled usklađenosti tijekom promjena.

Saradnja

saradnja

Imamo ograničeno vrijeme i financijsku sposobnost, a želimo ponuditi sveobuhvatnu uslugu, suradnja ima smisla samo među povezanim organizacijama. Imaju pouzdanu strukturu, kao i dobru međuljudsku sklad.

Idi na vrh