1, How long does it take from the application to the receipt of the certificate?

90 days

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: 2 - 4 man day per model series

FI audit: 1 - 2 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is work audited?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

-Application form

License in copy

Questionnaire including brief information about the company, production process, list of core production facilities, list of core test instruments, proof of registered trademark, etc.

Car structure and technical parameters

-COP control plan

-Declaration: how is type, series defined

-Declaration: how is VIN defined

-Explanation: we distinguish the different types by external marking

-Declaration: Operating instructions in Chinese

-COC certificate

-Review

-Quality Manual

-Quality system certificates in copy

-Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

CCC vijesti

Ažurirano je područje poslovanja kineskih certifikacijskih tijela za CCC Ažurirano je područje poslovanja kineskih certifikacijskih tijela za CCC 2019-09-14 - CNCA je pustila kina ccc certifikatna tijela za eksploziju ...
Objavljeni 10 novi kineski GB standardi Objavljeni 10 novi kineski GB standardi 2019-08-16 - Prema nedavnom tisku Državnog vijeća NRK-a, ...
Proizvodi za zaštitu od eksplozije CCC relevantni Proizvodi za zaštitu od eksplozije CCC relevantni 2019-07-17 - prema nedavnoj najavi CNCA, zaštita od eksplozija ...
374 novi i revidirani GB Standardi objavljeni 374 novi i revidirani GB Standardi objavljeni 2019-07-09 - Prema nedavnom tisku Državnog vijeća NRK-a, ...
173 novi i revidirani GB Standardi objavljeni 173 novi i revidirani GB Standardi objavljeni 2019-06-16 - Prema nedavnom tisku Državnog vijeća NRK-a, ...
ažurirani poslovni opsezi akreditiranih ispitnih laboratorija za CCC proizvode ažurirani poslovni opsezi akreditiranih ispitnih laboratorija za CCC proizvode 2019-05-30 - prema nedavnoj najavi CNCA, opseg poslovanja ...
Geely je osnovao inženjerski centar za istraživanje i razvoj u Njemačkoj Geely je osnovao inženjerski centar za istraživanje i razvoj u Njemačkoj 2019-05-18 - Prema China News Service Beijing u svibnju 16 da ...
Provedbena pravila za opremu gradskog željezničkog prijevoza oslobođena Provedbena pravila za opremu gradskog željezničkog prijevoza oslobođena 2019-05-06 - Prema nedavnom priopćenju iz China Certification ...
ažurirani su poslovni okviri ispitnih laboratorija za kineske proizvode CCC ažurirani su poslovni okviri ispitnih laboratorija za kineske proizvode CCC 2019-04-29 - poslovni opseg odabranih ispitnih laboratorija za Kinu CCC ...
21 novi i revidirani GB Standardi objavljeni 21 novi i revidirani GB Standardi objavljeni 2019-04-19 - Prema nedavnom tisku Državnog vijeća NRK-a, ...

podrška

Unterstützung

Radite u svom ritmu. Svoje projekte možete samostalno upravljati preko našeg portala, kao i pitati o osobnoj podršci. Zato smo se obvezali na priliku da dizajnirate svoje vlastite procese

Online uprava

Online uprava

Nudimo Vam mogućnost da provedete svoj proces certifikacije, ali ne morate napustiti know-how ili podršku iskusnih zaposlenika. On-line sustav je dizajniran za razne certifikate i nudi vam popise najčešćih pitanja, kao i gotove obrasce i tablice, kao i modul za razjašnjenje otvorenih pitanja s jednim od naših zaposlenika.

Promijeni certifikaciju

Promijeni certifikaciju

U našem brzom vremenu promjene u poslovnom životu su stalna pratnja. Može se razbiti vrlo brzo. Postoje unutarnji i vanjski razlozi za to. CS daje pregled usklađenosti tijekom promjena.

Saradnja

saradnja

Imamo ograničeno vrijeme i financijsku sposobnost, a želimo ponuditi sveobuhvatnu uslugu, suradnja ima smisla samo među povezanim organizacijama. Imaju pouzdanu strukturu, kao i dobru međuljudsku sklad.

Idi na vrh